Thursday, February 12, 2009

Passed the Inspection

With a minor problem. I missed the bracing on the two Brace-panels that are bolted to the floor with the special brackets. Brain fart, my mistake. No re-inspection required. I'll add the braces in then I'll get the windows and door for the shop. I'll also begin the wiring in the place. You know, panel, plugs and lights. I'm going to use florescent and have been trying to figure out how many. Right now I'm looking at 6 fixtures. It's really 17x21 inside, so I'm hope it is enough light. I can always add task lighting as needed.

Enjoy, but be careful of the splinters.

No comments: