Tuesday, July 14, 2009

Time for the Inspection

I've made all of the suggested changes for the electrical inspection, so it's time to call. The GFIs are all in place, cables nailed down, conduit attached to the wall and metal plates over the holes I passed the wire through. I think it's good. It will be 2 days before the inspection (if I can get it off) and I'll take a last run of pictures before filling in the trenches.

The electrician suggested that I run an extra pipe, or 2, through the trench while it's open, and cap the ends. Not sure what the advantage would be, although he suggested water or may be a signal wire of some kind.

Enjoy, and be careful of the splinters.

No comments: